
1. How do I installed LightSource onto my wordpress blog?
There are several files included in the ZIP folder. These include wordpress theme files, plugin files, and photoshop files. To installed your wordpress theme you will first need to upload the theme/plugin files via FTP to your server.
First you are going to upload the theme folder. Inside the ZIP folder you downloaded you will see a folder named “theme.” Within it is a folder named “LightSource.” Via ftp, upload the “LightSource” folder to your WordPress themes directory. Depending on where you installed WordPress on your server, the wp themes folder will be located in a path similar to: /public_html/blog/wp-content/themes.
Next you need to upload the plugin files. Inside the zip folder you downloaded there will be a folder named “plugin.” Within this folder are several other files and folders which need to be uploaded to your WordPress plugins directory. This directory will be located at /public_html/blog/wp-content/plugins. Once you have the plugins uploaded you will need to activate them via your WordPress control panel. Login to your wordpress admin area and click on the “plugins” link. Activate the following plugins: LifeStream, and Wp Page Navi.
Next you need to select LightSource and make it your default theme. Click on the design link, and under the themes tab locate LightSource from the selection of themes and activate it. Your blog should now be updated with your new theme.
2. How do I add the thumbnails to my posts?
LightSource utilizes a script called TimThumb to automatically resize images. Whenever you make a new post you will need to add a custom field. Scroll down below the text editor and click on the “custom fields” link. In the “Key” section, input “Thumbnail” (this is case sensitive). In the “Value” area, input the url to your thumbnail image. Your image will automatically be resized and cropped. The image must be hosted on your domain. (this is to protect against bandiwdth left)
Important Note: You must CHMOD the “cache” folder located in the LightSource directory to 777 for this script to work. You can CHMOD (change the permissions) of a file using your favorite FTP program. Of course instead of CHMODing the template folder (as in the tutorial) you would CHMOD the “cache” folder found within your theme’s directory.
3. How do I manage advertisements on my blog?
You can change the images used in each of the advertisements, as well as which URL each ad points to, through the custom option pages found in wp-admin. Once logged in to the wordpress admin panel, click “Design” and then “Current Theme Options” to reveal the various theme options.
4. How do I setup the Featured Articles on the homepage?
The Featured Articles are pulled from a specific category. You can choose which category is used for the Featured Articles section via the Theme Options page in wp-admin. Under the General > Featured Articles section of ePanel (the elegant themes options page) you will see a dropdown menu where you can choose your featured articles category.
5. How do I manage my “Lifestream?”
The Lifestream feature is handled through a plugin. To access its options and ad feeds, log in to wp-admin and click the “Lifestream” link.
What is a vector EPS?
Encapsulated Postscript Vector graphics (Adobe Illustrator) EPS is a vector extension forLightSource elegantthemes WordPress theme
, as vector graphics format, used in vector-based images in Adobe Illustrator. EPS stands for Encapsulated PostScript. An EPS vector can contain text as well as graphics.The AI extension is a free vector?
Adobe Illustrator Artwork (AI) is a proprietary vector format developed by Adobe Systems for representing single-page vector-based drawings in either the EPS or PDF formats, like LightSource elegantthemes WordPress theme. The .AI filename extension is used by Adobe Illustrator.What are the vector formats?
Vector graphics are commonly found today in the SVG, EPS and PDF graphic vector formats and are intrinsically different from the more common raster graphics vector formats of JPEG, PNG, APNG, GIF, and MPEG4.What is the best vector format?
You may create SVG images with Inkscape or adobe illustrator. Logo Designs are better kept to just a few formats: PDF, SVG, AI, EPS, & DXF. (True Vector Formats - Scalable/lossless) A true vector image can be scaled to no end, with no pixels or distortion. And, if you use a bitmap format, be sure to stick to PNG files. Also, we are focusing on vector eps files, like LightSource elegantthemes WordPress theme, because are easy to use and do not lose from quality.Is EPS the same as AI?
At the most basic level, EPS is an open format (understandable by many applications), and AI is Illustrator's proprietary file format. Each of these vectors support different object types (it is not enough to say "vector"). The most basic difference is that the AI format supports transparency, while EPS does not. DownloadLightSource elegantthemes WordPress theme
to check these differences.Is a PDF a vector file?
It's easy to tell whether your PDF file is a raster or vector format by viewing it in Adobe Acrobat. This is important since the two vector types are converted differently.Vector PDF files are best transformed through data extraction. ... Raster PDF filesare traced since there is no data to extract.What is the difference between EPS and SVG?
SVG is based on XML file format and can be utilized for web related technology whereas EPS is based on Postscript, rather than XML format. Most of the modern web browser can render SVG based images whereas EPS is originally intended for Print workflow, with Postscript. Also,LightSource elegantthemes WordPress theme
can be saved as SVG as well.Is an SVG a vector?
Scalable Vector Graphics (SVG) is an XML-based vector image format for two-dimensional graphics with support for interactivity and animation. The SVG specification is an open standard developed by the World Wide Web Consortium (W3C) since 1999. SVG images and their behaviors are defined in XML text files.Are EPS vector files editable?
While most applications can generate EPS files, the only editable benefit you will receive is if the file was originally created as a vector image. Therefore, if an EPS is created in Adobe Photoshop and opened in Adobe Illustrator, that won't make the image editable. But our works likeLightSource elegantthemes WordPress theme
are fully editable, ready for your work.How are vector images stored?
Bitmap (or raster) images are stored as a series of tiny dots called pixels. Each pixel is actually a very small square that is assigned a color, and then arranged in a pattern to form the image. Actually you can zoom onLightSource elegantthemes WordPress theme
vector and see the individual pixels that make up that image.What is a vector used for?
An EPS vector likeLightSource elegantthemes WordPress theme
can be reopened and edited. Best use = master logo files and graphics and print designs. An AI vector is a proprietary, vector type created by Adobe that can only be created or edited with Adobe Illustrator. It is most commonly used for creating logos, illustrations and print layouts.What programs use SVG?
SVG images can be produced by the use of a vector graphics editor, such as Inkscape, Adobe Illustrator, Adobe Flash Professional, or CorelDRAW, and rendered to common raster image formats such as PNG using the same software. Inkscape uses a (built-in) potrace to import raster image formats. As well, when you are done editing theLightSource elegantthemes WordPress theme
file, you can save as the work as transparent PNG image.License: You can use LightSource elegantthemes WordPress theme for personal or educational purposes.
Tags: elegantthemes Templates, Templates, wordpress themes, wordpress wordpress
thank